Human Designed.

A.I. Validated.

Robot Built.

Start-to-finished homes in 30 days.
5x faster than traditional home construction today. 9x faster tomorrow.

Bringing the assembly line to the property line.

Diamond Age’s Factory in the Field® brings the latest robotic construction tools directly to the job site to be used again and again.

Whereas 3D printing walls only automates 9% of home construction, our automation platform and suite of robotic tools offset up to 27% of the manual labor required to build a conventional home, creating safer and more efficient construction worksites.

And because our portable assembly lines are modular and OTA upgradeable, Diamond Age is on track to automate 55% of conventional home construction in 2024.

Factory in the Field®

Diamond Age’s mobile automated construction engines bring engineering efficiency and robotic assembly tools used in automotive and industrial systems to the job site.

Diamond Age slots into the same process production home builders already know, by vertically integrating GC services, supervision and labor.